Robust RRT*
sampling robust-planning
Robust RRT* is the RRT* form of Robust-RRT: its nodes carry reachable sets (every state that the system can be in there), and it keeps only edges that are proven safe. Each new node takes the cheapest neighbour with a proven-safe edge as its parent. Then each neighbour that is cheaper to reach through the new node moves under it (rewiring), but only if the whole moved subtree, with its new sets, is proven safe again, no node in it costs more and no node loses the goal. The best cost never increases. It converges to an optimum only under extra conditions, for example an unbounded rewire budget, exact steering and edge proofs that depend on the end points alone.
Pseudocode
algorithm RobustRrtStar(x₀, X₀, n, γ)input: nominal start x₀, start set X₀, number of iterations n, radius constant γoutput: the cheapest proven path to the goal found, or failureT ← tree with root (x₀, X₀)for i in 1, …, n dov, x-new ← extend(T, sample()) ▷ as Robust-RRT, edge proven safeif v ≠ nil thenr ← min(γ · (ln |T| / |T|)^(1/d), max-radius) ▷ d: dimensionNEAR ← nodes of T within r of x-newparent ← vfor each u in NEAR by increasing cost[u] + |u − x-new| doif cost[u] + |u − x-new| < cost-via(parent, x-new) and connect(u, x-new) is proven thenparent ← u ▷ choose the cheapest safe parentw ← insert(T, x-new, parent)for each u in NEAR doif cost[w] + |w − u| < cost[u] thentry-rewire(T, u, w)return path-to(cheapest node of T proven in the goal), or failure if there is nonefunction try-rewire(T, u, w)S ← subtree(u) in breadth-first orderif w ∈ S or |S| > budget thenreturn falsecontrol ← steer(w, u)if control does not end exactly at u thenreturn falsefor each node s in S do ▷ parents come before childrennew-set[s] ← prove(new-set[parent(s)], control(s)) ▷ u starts from set(w) with controlif new-set[s] = nil thenreturn false ▷ an edge is not proven safeif the cost of u does not drop, or a node of S costs more with new-set thenreturn false ▷ the cost may depend on the set widthif a node of S in the goal is not proven in the goal with new-set thenreturn falsecommit(T, u, w, new-set) ▷ parents, sets, goal flags and costs at oncereturn trueIn the crates
robust-planningChoose-parent and rewiring over proven-safe edges only; a rewire re-propagates and re-proves the whole moved subtree before committing.
Lineage
Led to
Nothing on this site.
Papers
- Sampling-based algorithms for optimal motion planning Sertac Karaman, Emilio Frazzoli · 2011· The International Journal of Robotics Research